References building maintenance/existing structures

Renovation work and modernisation of the main train station Landau (Palatinate)
The main train station in Landau is used each day by almost 6,000 commuters. Due to this high passenger frequency ...
mehr

Foundation reconstruction of the 160 year old Neckartailfinger bridge over the Neckar
The bridge structure in Neckartailfingen, which is around 160 years old and which weighs around 1,700 tonnes, rests on ...
mehr

Renovation of the bridge structure B10 Kriegstraße/Kühler Krug
On 14 June, the construction work began on the B10 Kriegstraße in the area of the „Kühlen Krug“. In addition to a new road surfacing ...
mehr

Renovation of the German embassy Stockholm in Sweden
The building of the German embassy in Stockholm was designed in the early sixties by the architects Godber Nissen ...
mehr

Reconstruction of the SWR studio in Karlsruhe
In the fifties, the new construction of the blue cube was a daring archetectural project. Therefore the reconstruction ...
mehr

Basic maintenance dam Wieblingen in the Neckar
The dam Wieblingen, built in the year 1925, requires extensive maintenance work ...
mehr

Renewal of the driving surface crossovers of the Kämpfelbach viaduct on the A 8
The Kämpfelbach Viaduct, which is around 325 m long and 33 m high, was replaced by a modern concrete bridge in connection with the six lane redevelopment ...
mehr

Concrete renovation of a cooling tower basin at Linde Gas in Worms
Linde developed from a cooling pioneer in the 1880ies to become an international technology leader. In the course ...
mehr

Maintenance of the Palmengarten bridge in Leipzig
The Palmengarten bridge leads the Lützner Straße through the Kleine Luppe near the Palm Garden in Leipzig. The finished parts ...
mehr
Sites/Addresses
 
Mainpage | Imprint | Contact | Sitemap | General terms and conditions of business | 
facebook | Search | Drucken | INTRANET