Maintenance of the Palmengarten bridge in Leipzig
The Palmengarten bridge leads the Lützner Straße through the Kleine Luppe near the Palm Garden in Leipzig. The finished parts (BT 70) of the tram bridge were assembled in the seventies. In the course of the renovation work, there was a basic renewal of the sealing and the caps, whereas a clear lengthening of the service life could be reached.

Builder
City of Leipzig

Construction period
September 2007 - June 2008

Construction site
Leipzig

Cost of the order
€ 330,000

Data and facts
Remove 410 sm sealing, mill 80 sm cement base, blast 357 sm cement base, 9,000 kg PCC mortar including primer coat, 35 m crack treatment and post-treatment, deep injection of 110 l cement suspension, 410 sm primer and scratch coat, with epoxiode resin and sealing with welding path

 