References Construction engineering

Referenzbild

New construction of a bridge over the motorway A 5 near Karlsruhe
In the course of the B 10 northern bypass Karlsruhe, the new interchange Karlsruhe-Nord on the motorway A 5 was created. The 30 m wide bridge construction is divided into two parallelly running partial structures and was completed in two sections. For the most possible upkeep of the traffic on the busy six lane A 5, the decision was made for a connection construction with reinforced concrete prefabricated parts longitudal supports and site concrete supplement. The surface construction as respectively 5 consistent t-beams through 4 fields has a variable construction height with a supportive distance of more than 20 metres.

Builder
Regional council Karlsruhe

Construction period
June 2004 - October 2006

Construction site
Motorway A5 Karlsruhe-Nord

Cost of the order
€ 3,900,000

Data and facts
2,900 cubic metres cement, 245 t reinforced steel

 
Mainpage | Imprint | Contact | Sitemap | General terms and conditions of business | 
facebook | Search | Drucken | INTRANET