References Construction engineering

Referenzbild

New construction of the bridge over the Rodenbach near Eisenberg
With a clearance height of 14 m and a maximum width between supports of 28 m, the bridge new construction over the Rodenbach represents a further connection structure which became necessary in the course of the new traffic routeing of the national road B 47. The construction type of the bridge is based on a bridge which is partially limited to a longitudinal direction. The construction of the bridge occurred smoothly on a supporting structure. .

Builder
State Operation Mobility Kaiserslautern

Construction period
August 2007 - October 2008

Construction site
Eisenberg

Cost of the order
€ 1,500,000

Data and facts
700 cubic metres cement, 110 t reinforced steel, 28 t prestressing steel

 
Mainpage | Imprint | Contact | Sitemap | General terms and conditions of business | 
facebook | Search | Drucken | INTRANET