References Construction engineering

Referenzbild

New construction of the Würdebach bridge RiFa Halle near Bennstedt
The bridge, which leads over the Würdebach, a railway line and an agricultural road, consists of three fields and is a total of 60 metres long. It replaces a construction from the year 1980. In the first construction section, the existing structure was demolished and the new construction of the Würdebach bridge began. The second construction section included the demolition and reconstruction of the street connections to the structure.

Builder
State operation construction Saxony-Anhalt branch office south

Construction period
August 2009 - July 2010

Construction site
B 80 near Bennstedt

Cost of the order
€ 1,595,000

Data and facts
1,550 cubic metres cement, superstructure made of reinforced concrete prefabricated parts and composite boards, 200 t reinforced steel, 10 t prestressing steel, 425 running metres bored pile foundation with bored piles with a diameter of 100 cm

 
Mainpage | Imprint | Contact | Sitemap | General terms and conditions of business | 
facebook | Search | Drucken | INTRANET